About the Project
The old lino floor was in bad shape so it was removed and a floating timber floor installed. Under the Lino was dried adhesive that needed to be scraped off to get a smooth substrate and sanded to provide a good platform for the thin underlay.
Clients Quote
The kitchen and hallways were professionally done by the team. It looked and felt so much better than the old lino and is so much easier to keep clean.
Sue R. Tweet
